Production shutdown? GBZ solution is ready in less than 24 hours

Case history

Request

A customer operating in the woodworking sector urgently requested our intervention due to the breakage of a fundamental component of his machinery.

A very serious problem that caused the immediate interruption of operations and that therefore had to be solved as soon as possible.

Solution

Thanks to our SOS Spares service, we provided our customer with the component to restart production in record time, already the following day.

That’s because starting from the technical drawing our team manufactured the component in few hours, ready to be installed in the same day it was requested.

Advantages for the customer

The timeliness of our response allowed the customer to resume operations which he had been forced to interrupt in a very short time, with no repercussions on productivity because he was able to resume working at full capacity the following morning.

Made: 5 May 2020